HomeHelp and adviceHome improvements

Connecting to a sewer

vp加速器2025年-outline

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

vp加速器2025年-outline

vp加速器2025年-outline

贝壳加速器官网,贝壳加速器下载地址,贝壳加速器pc版下载,贝壳加速器vpm  泡芙云官网网址,泡芙云电脑版下载,泡芙云用不了了,泡芙云打不开  泡泡狗加速器下载地址,泡泡狗加速器官网网址,泡泡狗加速器官方网址,泡泡狗加速器vp  章鱼加速器官方网址,章鱼加速器安卓下载,章鱼加速器电脑版下载,章鱼加速器vn  海鸥加速器官网,海鸥加速器最新版,海鸥加速器npv,海鸥加速器vqn  老王加速最新版本,老王vn官网下载,老王v电脑端,老王加速v2.2.17